14
Oct-2026
How to Determine if a Hot Runner Has Cooled Down CompletelyI. Simple method of measuring temperature Contact Temperature Measurement: Use a contact surface thermocouple thermometer to directly measure the metal surface temperature of the hot runner's runner p
-
13
Oct-2026
How long after the hot runner cools down can injection molding production beginI. Typical start-up time for the most common situations Applicable Conditions: Hot runner is cooled down (total temperature < 60℃), insulation resistance is steady > 20MΩ, and wiring is do
-
14
Oct-2026
How to Prevent Material Degradation During Hot Runner HeatingI. Measures for prevention of preheating Hot Runner Dryness Check: Verify that the hot runner is fully dried and cooled, and that the insulation resistance is steady and ≥20MΩ. Avoid residual
-
14
Oct-2026
Which materials are most easily degraded during hot runner heating?I. Materials with High Degradability Polyvinyl chloride (PVC) Degradation Trigger Temperature Above 180℃, rapid breakdown. If the temperature of a local section of the hot runner is above 200℃, a subs
-
14
Oct-2026
How to Monitor Precursor Signs of Material Degradation During Hot Runner HeatingI. Odor and visual checks Nozzle overflow observation During heating, watch periodically a little amount of molten material overflowing from the hot runner nozzles. The most immediate symptom of an on
-
14
Oct-2026
How Often Should Hot Runners Be Inspected During Heating?I. General Frequency of Inspection for all stages of Hot Runner Heating Ambient Temperature → Low-Temperature Preheating Stage (Ambient temperature to 30°C below heat distortion temperature o
-
14
Oct-2026
How long does sensor calibration take after leakage current repair?I. Total time for calibration of a single channel sensor Total Time: 30 to 45 minutes Core Time Elements: 10 minutes for regular thermometer docking and debugging + 15-25 minutes for single channel te
-
14
Oct-2026
Does the sensor need to be retested after calibration?I. Insulation Performance Re-Test 2.8. Stable Insulation Test at Room Temperature: Re-test the insulation resistance of all heaters channel by channel using a 500V digital megohmmeter, and the insulat
-
14
Oct-2026
How Long After Sensor Calibration Should Retesting Be Conducted?I. Retesting Timing Retesting should begin immediately following calibration of the sensor. There is no need to wait any longer, it is directly related to the stable state of the calibrated system and
-
14
Oct-2026
How Often Should Sensors Be Retested After Calibration?I. Immediate test for check after calibration Start Time: Start immediately after sensor calibration without waiting time. Test directly under stable working conditions at the rated operating temperat
-
14
Oct-2026
How to Determine if a Sensor Needs RetestingI. Events That Trigger Retesting Requirements Heater Leakage Fault: After leakage repair and sensor calibration, a comprehensive retest must be initiated immediately to remove remaining crosstalk effe
-
14
Oct-2026
How to Determine if a Sensor Needs RecalibrationI. Basic Approaches to Judgment Standard Instrument Comparison Method Operation Method: The probe of high-precision temperature monitoring instrument(CNAS calibration) is placed near the relevant temp