Home - Knowledge - Details

Debugging of glass sandblasting machine equipment

Debugging of glass sandblasting machine equipment

1) Start the fence motor, main motor, and dust exhaust fan, and take a 300mm piece × 1000mm glass is placed on the forward and backward trolley. Press the enter button and the trolley will automatically enter the sandblasting area. Then, it will automatically return to the sandblasting area and stop at the near end of the trolley. The sandblasting is completed.

2) Adjustment of the main motor conveyor belt: If the belt is too loose, the belt adjustment screw can be adjusted appropriately to adjust the tightness of the belt.

5.3 Precautions

1) The equipment must be operated by skilled personnel who have received training from our factory!

2) When checking the equipment, be sure to turn off the power supply of the unit to prevent electric shock accidents!

3) If any abnormalities occur during the sandblasting process, immediately press the emergency stop button to identify the cause of the problem and resolve it before continuing with the processing.

4) During the sandblasting process, always pay attention to the operation and temperature rise of each motor. If overheating is found, please stop the machine in a timely manner for inspection.

Calculation of glass sandblasting machine processing

At present, our company's fully automatic glass sandblasting machine takes processing 1850 * 2440mm glass as an example:

Machine level power 7.5KW

Processing energy 65 ㎡/h

Daily energy 520 ㎡/t

Electricity cost 0.89 yuan/kWh

News volume 52 yuan/t

Equipment depreciation fee of 15 yuan

Salary 120 yuan

Material loss of 45 yuan/t

Costs: 52+15+120+45=232 yuan

Cost: 232 yuan/520 square meters=0.446 yuan/square meter

Daily maintenance and upkeep of glass sandblasting machine

1) Regularly check the oil level of the gearbox. If the oil level is insufficient (less than 1/3 of the centerline of the oil level gauge), add oil and add ordinary gear oil (such as 40 # gear oil).

2) Regularly (usually once a month) check the tension of the belt. If the belt is too loose or too tight, the tightening device must be adjusted.

3) Add calcium based grease lubricating oil to the main transmission shaft bearing once a month.

4) The protective board of the main engine's inner box and each air knife should be regularly inspected. If severe wear is found, it should be replaced in a timely manner.

Specification for the use of electronic pulse dust collectors for glass sandblasting machines

1. Open the top door;

2. Remove the 4 pipes inside;

3. Take out the cage skeleton inside the cloth bag;

4. Clamp the groove 1 cm from the top of the cloth bag to the circular hole on the iron plate, and pull it up and down without moving;

5. Reinstall the cage skeleton;

6. Install the 4 iron pipes in place;

7. Install the top door properly;

8. After completing the above operation, the dust collector can operate normally.

Machine warranty period

The warranty period of the machine is one year from the date of delivery, and vulnerable parts are not included in the warranty.

Payment method:

30% of the total deposit for the goods, and 70% of the total payment before the goods arrive and the buyer unloads the machine.

Www.superbheater.comwwwsuperbheatercom

Send Inquiry

You Might Also Like