Hot press load test run
Leave a message
After the SMC/BMC composite glass fiber reinforced plastic molding machine starts to operate, the load should be gradually increased. If the condition is normal, the maximum load test can be carried out. After the maximum load test is successful, the system should be checked in time to see if it is working properly, and the pressure, noise, vibration, speed, temperature rise, liquid level, etc. should be comprehensively checked, and records should be made according to the requirements of the test.







