Operation Guide for Electric Heating Tube Shrinking Machine

Operation Guide for Electric Heating Tube Shrinking Machine

1. Preparation for operation of electric heating tube shrinking machine

1.1 Operators can only operate this machine after receiving training, and must be familiar with safety precautions;

1.2 Clean the workbench thoroughly and check if the hydraulic block is pressing the workpiece tightly.

2. Electric heating tube shrinking machine begins operation

2.1 Place the workpiece into the mold and adjust the size of the shrink tube according to the requirements;

2.2 Press the pressing button to press the workpiece down;

2.3 First, apply an appropriate amount of lubricating oil to the components of the electric heating tube shrinking machine, press the shrinking button, and carry out the shrinking operation;

2.4 The first piece can only continue processing after passing the self inspection and inspection;

During the operation of the 2.5 electric heating tube shrinking machine, the workpiece should be checked in a timely manner for any pulling damage. If any pulling damage occurs, the operation should be stopped immediately and the mold should be inspected and repaired.

3. After the operation of the electric heating tube shrinking machine is completed, cut off the power supply and clean the site thoroughly.

Operation steps of electric heating tube powder feeder

All employees who operate the electric heating tube powder feeder must undergo training before they can operate it;

Operation of electric heating tube powder feeder:

2.1 Parameter adjustment: Gently touch the parameter key on the touch screen to enter the parameter setting mode. Follow, delay oscillation, and tube length can be set, with a length unit of S. If you need to change the corresponding data, just touch the corresponding position to display a numeric keyboard. Set a tube lowering time. If the tube and core rod are too long or too short, press the emergency stop button and then press reset to readjust the parameter setting value;

2.2 Press the automatic button (before entering automatic production<especially after adjusting the equipment>, cancel all manual operations first, then press reset and automatic in sequence), and then look at the operation prompt on the next line. If it shows empty tube placement and is displayed as the origin state in the workflow, and the indicator lights on both sides are flashing, it indicates that the equipment is ready and can be placed empty tube;

After the tube is placed, press the green buttons on both sides at the same time to start the equipment;

2.4 When the operation of the electric heating tube powder feeder prompts that the display below is hanging the electric heating wire, the electric heating wire can be hung on the hook;

2.5 After hanging, press the two green buttons simultaneously for the second time, and the heating wire will be pulled into the empty tube. Check whether the terminal pins are placed correctly and whether the lower plug is installed correctly;

2.6 Then press the green buttons on both sides simultaneously again, and the equipment will continue to work for powder filling;

2.7 When the device stops working and displays tube removal, press and hold the foot switch to remove the tube that has been filled with powder;

2.8 At this time, the empty tube is placed and displayed under the operation prompt, so that the above work process can be repeated for production.