Product details of electric heating tube powder feeder

Product details of electric heating tube powder feeder

The FM-12 standard filling machine is a double protection medium chain transmission type filling machine, with the core rod relatively fixed. One of the two sets of transmission mechanisms will thread the filled pipe into the guide pipe, while the other set of transmission mechanisms will drive the guide pipe mechanism to quickly descend and slowly ascend. This structure allows for unrestricted filling length. The machine is equipped with a storage box, which can add 100kg of magnesium powder at once. When each filling is completed, the storage box automatically adds magnesium powder to the distribution box. The major advantage is that the operating station is concentrated in the middle position of the machine, which is labor-saving to operate. It is an ideal filling equipment for ultra long components.

1. Familiarize oneself with the process, determine the material and specifications of the electric heating tube wire, and then take out the corresponding specifications of the resistance wire, guide rod, and rubber plug;

2. Install the resistance wire, confirm whether the wire diameter is within the specification range, open three wires to visually confirm the spacing, and adjust the preset number of turns according to the resistance requirements to officially wind the wire. After passing the test, continue to wind the wire. Confirm every 30 minutes whether the spacing between the three wires is even. If there is any deviation, check all three wires and remove all heating wires from the machine;

3. Take out the lead out rod and put it into the ultrasonic cleaning device, pour in an appropriate amount of clean water for cleaning, set the cleaning time, and after cleaning, take it out and burn it dry;

4. Apply a suitable plastic stopper on the clean lower lead out rod to ensure that its center position is not offset;

5. Take out the cleaned heating wire for cutting, and according to the requirements of the process arrangement, add a rod and a gauge to the resistor;

6. Set the current and pressure for the first and second welding of the spot welding machine, and perform spot welding on the heating wire to ensure firm welding;

7. Evenly pull out the heating wire that has been measured on the scale, with a ratio of 1:1.7 between the distance of the screw and the density length of the wire, to confirm the uniformity of the wire spacing.