Home - Knowledge - Details

The second step of installation of reducer of blister packaging machine

The second step is to unscrew the screw on the dustproof hole on the outer side of the reducer flange, adjust the clamping ring so that the side hole is aligned with the dustproof hole, and insert the hexagon socket to tighten. After that, remove the motor shaft key.

 

20221202164656daa35c39af3e45ccb216a07faa075839.jpg (1269×740)

Send Inquiry

You Might Also Like