Daily maintenance of vacuum forming machine vacuum coating equipment
Leave a message
Daily maintenance of vacuum forming machine vacuum coating equipment
1. Do not dismantle blindly. The vacuum part of the mechanical problem is more difficult, and the disassembly is not very easy. Sometimes disassembly will cause other failures of the machine. Therefore, do not disassemble blindly.
2. Problems found during routine maintenance should be solved immediately. Don't wait until some equipment and parts are completely unusable before replacing; if there is a problem in the daily inspection and maintenance, it should be solved immediately. For example, some parts of the bearing are stuck in the turret, replacing the bearing and waiting until it is completely broken can be a big problem, which may directly cause the turret motor to burn out.
3. Regular maintenance, some people know that the daily maintenance of the equipment also needs regular maintenance? In fact, each equipment has its own life, such as the 2-year service life of the oil diffusion pump, which needs to be replaced in advance, and there is no problem in the production stage. If the routine maintenance and regular maintenance of the equipment life are done well, then the service life of the equipment will be extended and the production efficiency will be improved.
4. Develop good hygiene habits. Dust removal equipment and peripheral equipment will generate relatively large dust. Dust will affect static electricity and damage electronic components. Oil can quench and crack the conduit, causing some unexpected problems. The Dongguan vacuum coating equipment we use has its own particularity. Vermilion requires daily cleaning and hygiene.
Vacuum forming machine pressurization process
The pressurizing process is to store the inspected part in a container filled with high-pressure leak-indicating gas for a certain period of time. If the inspected part has a leak hole, the leak-indicating gas can enter the interior of the inspected part through the standard leak hole, and As the immersion time increases and the pressure of the inflation system increases, the partial pressure of the leaking gas inside the test piece will inevitably be affected and gradually increase.
www.superbheater.com







