Home - Knowledge - Details

Surface treatment and marking of both ends of the electric heating tube process vehicle

Surface treatment and marking of both ends of the electric heating tube process vehicle

9、 At both ends of the car

1. Ensure that the outgoing rod car is symmetrical after completion, and the difference in exposed lengths at both ends is not more than 2mm;

2. The length tolerance of the pipe is ± 0.5mm;

3. Use a file to remove burrs from the outer circle;

4. Self inspection is the main focus, and inspectors conduct spot checks.

Fixture measuring tools and equipment: trolley instrument lathe, white steel knife, tape measure, steel ruler.

surface treatment

1. Determine whether to perform surface treatment and the type of surface treatment according to the production order;

2. The coating layer is required to be uniform, smooth, and free from blistering, peeling, and local accumulation;

3. Do not damage (corrode) the lead out rod during pickling;

4. Pre clean the surface to be treated. Especially glue, oxidation spots, etc.

15、 Final inspection

1. Insulation: Infinite, lasting for 10 seconds;

2. Withstand voltage: φ Above 16 and within 4 meters in length, 3000V/10s; φ 10~ φ Within a length of 4 meters, 2000V/10s; φ 6. Within 2 meters in length, 1800V/10s;

No breakdown or flashover phenomenon

3. Cold resistance: meets the requirements of the production order;

4. Appearance inspection, geometric shape and size should meet product requirements; The above is a piece by piece inspection.

5. 5% spot check of leakage current per batch; Leakage current less than 0.5mA;

6. 5% of each batch of hot insulation shall be sampled for inspection; Simultaneously observe the uniformity of heating.

Within 1 minute after power outage, the thermal insulation should be detected to be ≥ 2M Ω. After cooling under natural conditions for 1 hour, the insulation should be monitored to recover to over 100 M Ω.

Fixture measuring tools and equipment: automatic breakdown device, resistance digital meter, leakage meter, caliper, tape measure, steel ruler, flat plate.

16、 Marking

Follow the requirements of the production order.

17、 Packaging:

Follow the requirements of the production order.

18、 Warehousing

Www.superbheater.comwwwsuperbheatercom